GTFO Wiki
Advertisement

The Datacenter environment features the most advanced technological installations in The Complex. It was added in Rundown 004. The Datacenter is one of the two Research Environments which may be found within the same expedition — the other being the Lab.

Appearance[ | ]

Datacenter contains server racks, terminals, extensive wiring, and display cases containing unusable Dataspheres. Datacenter also contains robotic humanoid prototypes, which are otherwise not seen anywhere else in The Complex. Most of the technology in the Datacenter was produced by CNTRL Technologies, which also manufactured the Terminal and the hacking tool used for the Hacking Minigame.

The screens display a few different messages:

  • Client server event
  • Update control
  • Bio tracker surveillance event log (Oct 11, 2053)
  • Service control
  • EBDF data stream (contains pieces of a lockdown report, the full text can be found in the section below)

EBDF data stream[ | ]

The EBDF data stream, or Lockdown Report, is a log found spread across a number of screens within the Datacenter environment. The complete log is included below:

Reported by: Boris Stanovich C066 (Report Analyst, Medical Dept.)
Date of report: October 07 2053 
Report #SAMD-C066-32 

This task is beyond my usual scope, but due to recent events I have been asked to compile a lockdown procedure for the Garganta Facility. I advise that all procedures here should be cross checked against existing department procedures as my ability to collate information is somewhat compromised given the current chaos. Many departments did not respond to my request for information, so the following procedures are drawn from existing data found in departmental handbooks, and personal communications with those department reps who did respond. To the best of my ability: 

MEDICAL
* All Schedule 1, 2 and 3 substances to be secured in approved containers. Approved containers include medical lock boxes, emergency lock boxes, narcotic cabinets fully contained within class A storage conditions, KDS approved safe rooms, KDS approved armored storage enclosures, Project Insight approved drop boxes.
* All magnetic devices that register more than 3,000 gauss to be powered down and covered with MagShield jackets.
* All medstation equipment (excepting classified substances) may be dispersed as needed without prior approval.
* All pressurized gasses and volatile substances to be properly secured in approved locations. Ensure all tank straps are fully synched and release values correctly positioned.
* All radioactive equipment and substances to be chambered permanently and labelled according to current H & S guidelines. Containment chambers must then be located within 15 meters of an appropriate CMS.

ENGINEERING & POWER
* All Containment Material Silos (CMS) to be unlocked and available for free use as needed. This includes Water, Sand, Clay, and Boron silos. Containment procedure guidance posters to be clearly visible upon accessing all CMS locations.
* All satellite power generators (gasoline, nuclear and geothermal) to be switched to low power mode, with both the automatic maintenance and self-calibration cycles set to 14 days.
* All Jefferies Tubes to be depressurized, then welded shut and appropriately tagged.
* Reactor 1 to be set to low output mode with the priority mode set to coolant pumps.
* Reactor 1 thermal trips to be set at 50% of peak load.
* Reactor 1 containment doors to be secured.
* Do not weld the containment doors at Reactor 1.
* Do not weld the containment doors at Reactor 1. (this information is presented twice in the department handbook - C066)
* Sarcophagi to be deployed at Reactors 2,3, and 4. Override clearance set to Class A personnel only.
* Containment doors for Reactors 2,3, and 4 to be welded shut.

ENVIRONMENTAL CONTROL 
* Flush and seal the cooling tubes for the auxiliary cooling system, use the C67 or C67B procedure.
* Air Intakes diverted to only use green tagged locations.
* Green tags at intake locations may only be applied once the location has been physically inspected and decontaminated using DeVac procedures.
* Complex standard temperature set to 18c. Tolerance set at +/- 4c.
* Diurnal Illumination System Control(DISC) service disabled. If the Emergency Lighting Grid(ELG) does not initiate immediately upon DISC shutdown, it must be manually initiated from the Level 3 Environment Control Center.
* ELG power feed diverted to Reactor 1. Priority set to “Motion Detect” for all floors (note that floors under Project Insight or KDS control control may retain their own ELG power priority. This is intended).

COMMUNICATIONS 
* Hearsay logs to be localized and vaulted.
* Hearsay servers to be patched to the intranet network only. All Hearsay external network connections to be physically disconnected at the Mech Room on sub-level 5.
* Central surveillance records to be encrypted @ 2048K and disconnected from external network.
* Sub-level communications to be limited to A, B Class personnel only. All other sub-level comms by approval only.
* Cellular grid deactivated and Faraday Lock engaged. All external communication networks must be routed through COMSAT for approval.

SECURITY 
* Rescind pre-approved gate clearance for all personnel. Passes must be shown. Visual approval is rescinded.
* Clear local cache on all Retinal/Fingerprint/DNA scanner units after every use. No historical data to be stored on any devices. If the Central surveillance records have already been decrypted, this should happen automatically. If not, physically remove the network cables on the local device.
* Seal all bulkhead doors and isolate inter-deck access control to A Class personnel only. Local control can remain with C class personnel.
* PID badges to be scanned at the assembly point and confirmed against the Central Personnel Database(CPD). Once matched, evacuation via any evacuation designated elevator is permitted.
* Any person that cannot be matched with the CPD, or who present at the assembly point without appropriate identification, should be escorted to a KDS holding room until they are cleared by the on-duty KDS officer.
* No persons should be allowed access to an evacuation designated elevator unless they have been matched by the CPD, or approved by the on-duty KDS officer. No exceptions.
* All at designated egress points. Once the elevator is in motion, it must not stop at any other point other than the designated egress point.

HUMAN RESOURCES 
* All personnel should gather at their designated assembly points prior to evacuation.
* Remind employees that they should move in a calm and orderly fashion.
* All personnel are limited to (1) N - 137B Storage Unit for personal belongings. All N - 137Bs must be screened for biological and radioactive matter then tagged with a PID number. The units can then be claimed at the appropriate Pneumatic Delivery center on the surface. Any unmarked N - 137Bs will be sealed in the sub-level 02 vault indefinitely.
* Any person attempting to transport contraband out of the facility should be moved to a KDS holding room. The confiscated items should be locked in the KDS vault, and the on-duty KDS officer should be notified.

Gallery[ | ]

Advertisement